Pavement work records that stay with the site.
Track pavement work, contractors, and costs. Everything lives on a map of the site.
Contract Items
2026 Pavement Program6
- #26-041West truck court Sep 14 Complete 54,000 SF$189,0002 West truck court, 2-inch mill and overlay
- #26-042Staging lanes Oct 12 Planning 9,000 SFEst. $72,0001 Trailer staging lanes, 6-inch full-depth asphalt patching
- #26-043Dock apron No date Draft 12,000 SFEst. $4,8001 Dock apron, clean and reseal 1,600 LF of concrete joints
- #26-044West dock apron Nov 2 Planning 15,600 SFEst. $46,8001 West dock apron, replace spalled concrete panels
- #26-045East court Aug 21 Complete 17,600 SF$9,6801 East court, crack seal and sealcoat
- #26-046Main entrance No date Draft 2,160 SFEst. $8,6401 Main entrance, 3-inch mill and overlay
6 Contract Items · 110,360 SF · $330,920
Today your pavement records are scattered.
| Where it lives today | The problem | With PaveGrid |
|---|---|---|
| Spreadsheets | No location. | Every piece of work is on the map. |
| PDF markups | Not searchable. | Every crack seal, patch, and overlay is searchable. |
| Inboxes | Invoices only one person can find. | Every invoice is tied to the work it paid for. |
| Memory | The engineer who knows retires. | The history stays with the pavement on the map. |
Four steps from site plan to record.
1
Upload the basemap.
An aerial photo, plan image, or PDF plan sheet. PaveGrid runs in the browser.
2
Calibrate it once.
Click four features on your plan, then the same four on a reference map. Every outline then measures in real feet.
3
Outline the work.
Draw the area on the map, or import the coordinates. PaveGrid measures it either way.
4
Log what was done.
Record category, severity, contractor, thickness, and cost. Attach photos and documents.
Every outline on the map is a row in the table.
Contract Items 6 totalshowing 1–6
| Actions | Paving Date | Type | Number | Status | Description | Quantity SF | Cost | Created |
|---|---|---|---|---|---|---|---|---|
| Nov 2, 2026 | Bid Item | 26-044 | Planning | West dock apron, replace spalled concrete panels | 15,600 | Est. $46,800 | 6d | |
| Oct 12, 2026 | Change Order | 26-042 | Planning | Trailer staging lanes, 6-inch full-depth asphalt patching | 9,000 | Est. $72,000 | 1w | |
| Sep 14, 2026 | Bid Item | 26-041 | Complete | West truck court, 2-inch mill and overlay | 54,000 | $189,000 | 3w | |
| Aug 21, 2026 | Bid Item | 26-045 | Complete | East court, crack seal and sealcoat | 17,600 | $9,680 | 1mo | |
| – | Bid Item | 26-043 | Draft | Dock apron, clean and reseal 1,600 LF of concrete joints | 12,000 | Est. $4,800 | 2w | |
| – | Change Order | 26-046 | Draft | Main entrance, 3-inch mill and overlay | 2,160 | Est. $8,640 | Today | |
| Total | 110,360 | $330,920 |
- Every change keeps who, when, and what changed. Nothing is overwritten.
- Upload any invoice or pay app. PaveGrid matches each line to the work on the map.
- Export the table to CSV or PDF, and the map as a PDF sheet.
Pavement records for ports, airports, and highways.
| Site | Pavement you track |
|---|---|
| Port terminals | Yard lanes, crane rail joints, gate lanes. |
| Airports | Aprons, service roads, landside lots. |
| Distribution hubs | Truck courts, dock aprons, drive lanes. |
| Industrial campuses | Parking fields, internal roads, loading areas. |
| Highways and freeways | Mainline lanes, ramps, paved shoulders. |
Request a walkthrough